Skip to main content
Service 04

Door Frames & Hardware

Commercial openings, frames, and hardware coordinated for accurate fit, reliable operation, and clean integration with surrounding wall systems.

Discuss Doors and Hardware

Finished interior corridor with aligned commercial openings and doors

Openings Capability

Every Opening Has to Work—Technically and Visually.

Door openings connect wall geometry, frame installation, hardware schedules, finishes, and daily operation.

Accurate dimensions, wall conditions, handing, frame alignment, hardware requirements, and adjacent finishes must be reviewed together. Final adjustment and operation are part of how the opening is experienced.

Commercial corridor opening showing clean frame and wall transitions
Supplied project photography. Scope inclusion remains subject to approved project documents and contract requirements.
Door & Hardware Scope

Frames, Doors, Hardware, Accessories, and Final Opening Adjustments.

Commercial openings depend on correct frame conditions, handing, hardware information, adjacent wall assemblies, accessories, clearances, and final operation.

01

Frame Setting

Commercial frames positioned and coordinated with the documented wall condition.

02

Door Installation

Doors installed where included in the approved project scope.

03

Hardware Installation

Scheduled hardware installed and coordinated with opening requirements.

04

Closers & Accessories

Included operating and protective accessories installed to the approved schedule.

05

Adjustments

Alignment and operation reviewed during completion and punch.

06

Adjacent Finish Coordination

Interfaces with framing, drywall, paint, trim, and access systems considered.

Opening Coordination

The Opening Must Coordinate With the Wall, Hardware Schedule, and Finished Surroundings.

  • 01Opening dimensions
  • 02Wall type and frame condition
  • 03Door handing
  • 04Approved hardware schedule
  • 05Access-control interfaces where documented
  • 06Finish, tolerances, and operation
Finished elevator and door opening with coordinated frames and surrounding surfaces
Opening Coordination

The Frame, Wall, Hardware, and Finish Must Read as One Assembly.

A clean opening depends on more than the door itself. The surrounding framing, drywall, trim, paint, hardware, and access conditions all influence fit and performance.

Opening Execution

From Opening Review to Installation, Adjustment, and Punch.

The door and hardware sequence focuses on opening conditions, frame coordination, approved hardware information, installation, alignment, and final operation.

  1. 01

    Review Openings

    Confirm opening sizes, wall types, frame conditions, handing, and schedules.

  2. 02

    Coordinate

    Resolve interfaces with framing, drywall, finishes, and documented access systems.

  3. 03

    Install

    Set included frames, doors, hardware, and accessories to the approved scope.

  4. 04

    Adjust

    Review alignment, clearances, closing, latching, and punch conditions.

Opening Package Review

Have a Commercial Door and Hardware Package to Review?

Share the opening schedule, hardware information, wall types, details, and project timeline for review.